Industry expertise
At PaintPVC.com Limited, we are dedicated to providing durable and effective solutions for our commercial clients in the restoration and refurbishment of aluminium curtain wall and cladding systems.
We offer the most comprehensive service for restoration and refurbishment work in commercial properties across the UK and Ireland. Our thorough pre-testing process ensures optimal results throughout every project.
-
Our Standard Pre-Tests include:
1. Assessment of the Original Powder Coated System:
- Inspect the aluminium surface for overall condition.
- Identify any signs of wear, corrosion, or damage.
2. Dry Film Thickness (DFT) Measurement:
- Utilise a DFT gauge to measure the thickness of the existing powder coating, determining its suitability for repainting.
3. Dolly Test for Adhesion:
- Conduct a dolly test to evaluate the adhesion of the powder coating. This involves applying a small adhesive disc to the surface and measuring how well it adheres when removed.
4. Soluble Salt Testing:
- Perform a soluble salt test to detect surface contamination. This process includes using a test kit to analyse water samples collected from the surface for soluble salt levels.
5. Documentation of Findings:
- Record all measurements and test results to inform the recoating process and provide a reference for future evaluations.
-
To further enhance our pre-coating evaluation, we offer a range of additional assessments:
1. Surface Profile Measurement:
- Use a profilometer to gauge the surface roughness of the aluminium, ensuring optimal mechanical adhesion for the new coating.
2. Chemical Resistance Evaluation:
- Assess the existing coating’s resistance to chemicals, particularly in harsh environments, to inform the selection of a compatible paint system.
3. Environmental Assessment:
- Analyse environmental factors affecting the façade, including UV exposure, weathering, and local pollutants, to guide the choice of a durable paint.
4. Moisture Content Measurement:
- Evaluate the moisture content of the existing coating, as elevated moisture levels can impact adhesion and the curing process of the new paint.
5. Compatibility Testing with Proposed Coatings:
- Conduct patch tests to assess the compatibility of proposed coatings with the existing powder coat, ensuring proper adhesion and aesthetic appearance.
Pre-Testing:
Industry trusted
Our painting process is guided by the results of these tests, allowing us to recommend the most effective strategy for recoating surfaces.
We employ independent paint inspectors to oversee all our projects, ensuring that they are executed in accordance with the manufacturers' specifications.
This approach provides our clients with peace of mind, assuring them of the best possible outcome and a durable, long-lasting finish.
We have been involved in a range of fantastic commercial projects across the island of Ireland, including the stunning 5-star Cliff House Hotel, St. Mary’s University College & Queen’s University in Belfast, new crematorium in Newtownabbey and many more projects.
This year we completed a range of powder coating failures across the island of Ireland including the Atlantic Point Apartments in Portstewart, Co. Antrim as featured above.
















We have been involved in a range of fit-out projects including the new flagship Apple Store, five new Domino's restaurants, the award-winning Room2 Hotel, and many other projects across the country. We regularly work with some of the largest construction companies nationwide.

GET A FREE QUOTE
Our contact form, below, is the best way to get a free quotation. This form is linked directly to our job management software. Please provide as much detail as possible, including photos. The team might have to give you a quick call to discuss your project before sending quote.